NOW OPEN
The street facility takes on a triangular shape to maximise the available space between the playing pitches and the existing topography.
We have designed a low-level taco quarter to provide that initial burst of speed rolling into the park, the first drop features a bank with twin hubbas. Both hubbas can be sessioned up/down, whether you're goofy/regular, so that riders have multiple options regardless of ability.
The facility splays outwards in a Westerly direction, making space for a hipped driveway to the south. The driveway features a grinding ledge over the apex of the banks and allows for transfers into the hip and vice versa.
Moving on from the driveway we have designed a large tombstone quarterpipe to give riders speed for the return run. The 1800mm high quarterpipe drops down to 1200mm along the bank end of the facility, linking up all the lines in the space. This line of quarters changes direction to create a hip for transfers/aerials, blending out into a large flatbank. The 1200mm high bank provides a perfect line into a large combination unit which connects along the Northern edge of the site. In line with user group requests we have designed a street-style hipped bank which flows over a unique dropped driveway; the bank is perfect for carving over the drop. The driveway also connects to a wallie style grind ledge which can be sessioned in conjunction with the banks. The ledge setup joins into a manual pad to the South which is angled to take account of the riding lines.
Perranporth Skatepark
Budnic Hill
Ponsmere
Perranporth
TR6 0BP